"Too few points"

Print this Topic

This checklist is for when the nonlinear regression process never started, and instead reports "Too few points" at the top of the results. View other checklists if your curve fit ended with a different completion code: Completed, Bad initial values, Interrupted, Not converged, ambiguous, Hit constraint, Don't fit, Perfect Fit or Impossible weights.

Regression requires at least as many data points as parameters. So if you fit a dose-response model with four parameters (Bottom, Top, logEC50, and HillSlope), you must have four or more points or Prism will simply report "too few points".

Having as many points as parameters is the bare minimum. Prism will try to fit the model, and will report a perfect fit, and so not be able to report standard errors or confidence intervals. If there are only a few more points that parameters, Prism is likely to end up with an ambiguous or not converged fit.



Copyright (c) 2007 GraphPad Software Inc. All rights reserved.
URL: http://www.graphpad.com/help/Prism5/Prism5Help.html?reg_analysischeck_toofewpoints.htm